PCS 7 experience
No |
Description of project |
Technology |
1 |
Automated control system of steel finishing process at installation “Furnace Ladle”. PK-60 Station 1. Project, assembly, commissioning |
PCS7 v6.1 |
2 |
Oseberg SAS Upgrade Automation System Upgrade of Oil & Gas Platform Oseberg from Teleperm to PCS7 SIEMENS Development and testing software for PCS7 v.6.1 |
PCS7 v6.1 |
3 |
Automated control system of steel finishing process at installation “Furnace Ladle”. Station 2. Project, assembly, commissioning |
PCS7 v7.0 |
4 |
Snorre A SAS Upgrade Automation System Upgrade of Oil & Gas Platform Snorre A from S5 to PCS7 SIEMENS Development of control system diagrams on MicroStation V8S |
PCS7 v7.0 |
5 |
Snorre A SAS Upgrade Automation System Upgrade of Oil & Gas Platform Snorre A from S5 to PCS7 SIEMENS Development and testing software for PCS7 v.6.1 |
PCS7 v6.1 |
6 |
ACS TP of sponged titanium production with capacity 15000 tons per year. Repartitions from 1 to 9. Project, commissioning |
|
7 |
ACS TP of purified TiCl4 production with capacity 25000 tons per year for pigment titanium dioxide production. Project, commissioning |
PCS7 v7.1 |
8 |
ACS TP for sponged titanium production. Project, commissioning |
PCS7 v7.1 |
9 |
ACS TP for sponged titanium production.Project, commissioning |
PCS7 v7.1 |
10 |
ACS TP of dispatching and MCC energy distribution for hydrogen station. Project, delivery, commissioning |
PCS7 v7.1 |
11 |
ACS TP, SCS, DPC, dispatching and MCC energy distribution for trichlorosilane production. Project, delivery, commissioning |
PCS7 v7.1 |
12 |
ACS TP, dispatching, MCC energy distribution for polycrystalline silicon production. Project, delivery, commissioning |
PCS7 v7.1 |
13 |
Automated control system of Vent Gas Recovery for polycrystalline silicon production. Commissioning |
PCS7 v7.1 |
14 |
Software development for project Samovar and Heat Tracing. Project, commissioning |
PCS7 v7.1 |
15 |
Automation system support |
PCS7 v6.1 |
16 |
New Vertical Seed Conditioner. Seed Preparation Building – Brocklebank. Project, commiss |
PCS7 v8.0 |
17 |
Migration of Crush DCS from S5 and Wizcon to PCS7.Zenith project. Project,commissioning |
PCS7 v8.0 |