Boryscew Plastic Rus, Dzerzhinsk, Russia
Boryscew Plastic Rus, Dzerzhinsk, Russia
Link:
Year:
2014
Technologies:
abas ERP
Project status:
In progress
About the project:
abas ERP implementation
JSC "Semiconductor Plant” Zaporizhzhya
2010
Autumated control system, Structured cable systems, Data Center, dispatching and energy distribution MCC for trichloresilan production
Zaporozhye titanuim&magnesium plant
2009
Partition of evaporate chlorine production. Detailed design.
JSC "Semiconductor Plant” Zaporizhzhya
2011
ACS TP of despatching and MCC energy distribution for hydrogen station. Project, delivery, adjustment
JSC "Semiconductor Plant” Zaporizhzhya
2011
ACS TP, despatching, MCC energy distribution for polycrystalline silicon production. Project, delivery, adjustment
JSC "Ukrplastic", Kiev, Ukraine
2001
Modernization of automated control system of plastic foil production line . Project, assembly, adjustment