The latest project
Read more
ACS of TP of the feeding, transportation and removal of semi-finished products on the production line Burde on PJSC “Centravis Production Ukraine”.
ACS of TP of the feeding, transportation and removal of semi-finished products on the production line Burde on PJSC “Centravis Production Ukraine”.
Link:
Year:
2014
Technologies:
Siemens Simatic S7-315-2 PN/DP/ WinCC flexible 2008/OP77b/ Profibus/Industrial Ethernet
Project status:
Completed
About the project:
ACS of TP of the feeding, transportation and removal of semi-finished products on the production line Burde in the tube drawing shop on PJSC “Centravis Production Ukraine”
ACS of TP of vacuum arc furnace, «Nerta LTD»
2014
ACS of TP of vacuum arc furnace “Nerta LTD”, Zaporozhye, Ukraine.
ACS von TP of hot metal desulphurization with granulated magnesium, Qingdao
2014
Only reliable world wide known manufacturers as SIEMENS, PHOENIX CONTACT, RITTAL were used while designing. Design documentation was developed indesign environments EPLAN Electric P8, AutoCAD, Microsoft WORD and Microsoft EXCEL.
AzovElectroStal, Mariupol, Ukraine
2013
Automated control system in electric furnace DSV №27
PROMMASHKOMPLEKT
2013
Automated control sysem of weels transportation unit
LLP "Prommashkomplekt"
2013
Automated transport system and auxiliary materials handling machinery
LiuZhou Iron and Steel Co., China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Metallurgical plant SINOSTEEL, Beijing, PRC
2011
Automated control system of ferronickel production. Project, adjustment
Yunnan Chaotuo Titanium Industry Co., Ltd. PRC
2011
Automated control system of commercial Titanium Tetrachloride Production with Charge Preparation. Project , adjustment
ARICOM PLC. PRC
2011
Automated control system of Titanium sponge production.Section 1 to 9. Project, adjustment
Metallurgical plant, Fudzhou, PRC
2010
Automated control system of ferronickel production. Project, adjustment
Pan’gang Group Steel City Enterprises Company. PRC
2010
Automated control system of Purified TiCl4 Production with a Capacity of 25 000 t/year for Titanium Dioxide Pigment Production.Section 1. Project, adjustment
CJSC "AzovElektroStal", Mariupol
2010
Adjustment, start up of Kuenkel Wagner moulding forming complex
UNION OF MYANMAR. MEC. IRON MAKING PLANT, Burma
2010
APCS and MCC of Hot Metal Desulphurization Unit and Lance Making Section. Romelt Shop
YINGKOU DSMK HIGH, Taiwan
2010
MAGNESIUM INJECTION HOT METAL DESULPHURIZATION FACILITIES
Tianjin Metallurgy Group Zha San Youfa Iron & Steel Co., Ltd.
2010
System of Hot Metal Desulphurization with Granulated Magnesium
Tianjin Tiangang United Steel Co., Ltd. PRC
2010
System of Hot Metal Desulphurization with Granulated Magnesium
Metallurgical company "Panzhihua Iron and Steel", PRC""
2010
Automated control system of Titanium sponge production. Project, adjustment
JSC "INTERPIPE NTZ"
2009
Warehouse of finished product in wheel rolling shop
Sanming Metallurgical plant, PRC
2009
Automated control system of machine for elastically vibrating steel strip input into the mold slab of CC machine
CJSC "AzovElektroStal", Mariupol, Ukraine
2008
Automated control system of alloy materials and additions infusion into furnace DSP-60and furnace-ladle. Project , assembly, adjustment
CJSC "AzovElektroStal", Mariupol, Ukraine
2008
Automated control system of steel finishing process at installation “Furnace Ladle”. Station 2. Project , assembly, adjustment
Pan’gang Group Steel City Enterprises Company. PRC
2008
Automated control system of Purified TiCl4 Production with a Capacity of 25 000 t/year for Titanium Dioxide Pigment Production. Section 2. Project , adjustment
Guo Feng Steel Limited Company. Steel making plant. Station 2. PRC
2008
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Lianyuan Irоn аnd Stееl Group Со., Ltd. PRC
2007
Automated control system of ferronickel production technological process. Project
Jinxi Iron and Steel Co., Ltd. Steel making plant. PRC
2007
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Lengshuijiang Iron Steel&General Works. Steel making plant. PRC
2007
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Guo Feng Steel Limited Company. Steel making plant. Station 1. PRC
2007
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Jiangsu Shagang Group Huaigang Special Steel Co., Ltd. Steel making plant. PRC
2007
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Zhejiang Yuanli Metal Product Group Co.,Ltd. Steel making plant. PRC
2007
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
TONGHUA STEEL GROUP CO. LTD. Steelmaking Plant. PRC
2007
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
JSC NTMK, Nijnii Tagil, Russia
2007
Automated control system of coke-oven battery’s door-extracting machine
JSC NTMK, Nijnii Tagil, Russia
2007
Automated control system of coke-oven battery’s coke pusher
CJSC "AzovElektroStal", Mariupol, Ukraine
2007
Automated control system of electric filter and two smoke exhausters for gas-cleaning system of “Furnace Ladle” installation and two steel-making furnaces DSP5. Project , assembly, adjustment
JSC “Dneprospetsstal” A.M.Kuzmina, Zaporozhye
2007
Automated control system of electroslag remelting furnace 1065
Rizhao Steel Group Co., Ltd. Old Steel making plant. PRC
2006
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
CJSC "AzovElektroStal", Mariupol, Ukraine
2006
Automatic control system of bucket-heating station.Project , assembly, adjustment
Rizhao Steel Group Co., Ltd. Steelmaking Plant #1. PRC
2006
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
CJSC "AzovElektroStal", Mariupol, Ukraine
2006
Automated control system of steel finishing process at installation “Furnace Ladle”. Station 1. Project , assembly, adjustment
Jiangsu Shagang Group Co., Ltd. РRС
2006
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
JSC “Dneprospetsstal” A.M.Kuzmina, Zaporozhye
2006
Automated monitoring and control system of semicontinuous furnace thermal modes
Lianyuan Irоn аnd Stееl Group Со., Ltd. Construction Phase 2. PRC
2006
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
CJSC "AzovElektroStal", Mariupol, Ukraine
2006
Control system of auxiliary pouring-cooling area of molding line modernization
HangZhou Iron & Steel Stock Co., Ltd New Steelmaking Plant. PRC
2006
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment
Xining Special Steel Co., Ltd. PRC
2006
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment
Baotou Iron & Steel (Group) Co., Ltd. New Steelmaking Plant. PRC
2006
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment
Taiyuan Iron and Steel Group Co.,Ltd .Ne w Steelmaking Plant. PRC
2005
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment
Fujian Sangtang Iron and Steel Co., China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Xiangtan Iron and Steel Co., Steelmaking Plant No. 1, China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Xiangtan Iron and Steel Co., Steelmaking Plant, China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Wuhan Iron and Steel Co., Steelmaking Plant No. 3 China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Qian'an Iron and Steel Co., China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Tonghua Iron and Steel Co., Steelmaking Plant No. 1, China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Qingdao Iron and Steel Co., Steelmaking Plant No. 1, China
2004
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
CJSC "AzovElektroStal", Mariupol, Ukraine
2004
Modernization of Kuenkel - Wagner software of mold production line and mix preparation. Project, adjustment
Tangshan Iron and Steel Co., Steelmaking Plant No. 2, China
2004
Control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Dazhou Iron and Steel Co., China
2004
Control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Lianyuan Iron and Steel Co., China
2004
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment
Tian Jin Iron and Steel Co., Steelmaking Plant No. 1, China
2003
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Qingdao Iron and Steel Co., Steelmaking Plant No. 1, China
2003
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
OSC "VIT", Zaporozhye , Ukraine
2002
Development of control system of metal cross cutting line. Project, supply, assembly, adjustment
CJSC SSPC "DIV", Dnepropetrovsk, Ukraine
2002
Development and implementation of deslagging machine control system. Project , delivery, assembly
Tangshan Iron and Steel Co., Steelmaking Plant No. 1, China
2002
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
JSC "Dneprospetsstal", Zaporozhye, Ukraine
2002
Implementation of informational hardware-software complex for stove-busket in steel-rolling shop No. 2. Project, delivery
Handan Iron and Steel Co., Steelmaking Plant No. 3, Phase 1, China
2002
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Xiangtan Iron and Steel Co., Steelmaking Plant No. 2, China
2002
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Beijing Iron and Steel Co., Steelmaking Plant No. 2, China
2002
Automated control system of two stations of complex hot metal processing . Installation of equipment and implementation of intense sulfur removal from hot metal technology. Project, supply, assembly, adjustment
Taiyuan Iron and Steel Co., Steelmaking Plant No. 2, China
2001
Reconstruction of automated control system of two existing stations of hot metal desulphurization with mixture of magnesium and lime to hot metal desulphurization with granulated magnesium without agents . Project, assembly, adjustment
JSC "Dneprospetsstal", Zaporozhye, Ukraine
2001
Development of automated control system of telemetering of energy resources technical accounting. Project, supply
Beijing Iron and Steel Co., Steelmaking Plant No. 2, China
2001
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment
Wuhan Iron and Steel Co., Steelmaking Plant No. 1, China
2001
Reconstruction of automated control system of two existing stations of hot metal desulphurization with mixture of magnesium and lime to hot metal desulphurization with granulated magnesium without agents . Project, assembly, adjustment
JSC "Mariupol metallurgical plant named after Ilich", Mariupol, Ukraine
2000
Modernization of software and adjustment of automated control system of calcic kiln No. 2. Project, adjustment
JSC "Poltavsky plant of medical glass", Poltava, Ukraine
2000
Modernization of automated control system of charge compounding area. Project, supply, assembly, adjustment
Institute "UKRGIPROMEZ", Dnepropetrovsk, Ukraine
2000
Development of mathematical model and software of automated control system of kilns of mill 280 in the rolling plant of JSC Dneprospetsstal ". Project "
JSC "Dneprospetsstal", Zaporozhye, Ukraine
2000
Modernization of automated control system of bulk solids' path of argon- oxygen refinement facility in СПЦ 2. Project, supply
JSC "Mariupol metallurgical plant named after Ilich", Mariupol, Ukraine
1999
Automated control system of gas record at a metallurgical plant. Project, supply, assembly, adjustment
JSC "Dneprospetsstal", Zaporozhye, Ukraine
1999
Modernization of radial forging machine РКМ -1000. Project, supply, assembly, adjustment
JSC Zaporozhye Metallurgical plant "Zaporozhstal", Zaporozhye, Ukraine
1998
Modernization of control systems of automated cutting line ZUNDWIG . Project, assembly, adjustment