-
By region 200
-
By industry 201
Modernization of elevator PLC equipment
- Link:
- Year:
- 2014
- Technologies:
- - operator station PC, WinCC 7.2; - сontroller SIMATIC S7-412-2PN, SIEMENS; - distributed peripheral devices (I/O signal system) SIMATIC ET200M, SIEMENS;Multiple - data acquisition station – SIMATIC S7-300 ET200M, SIEMENS; - operator station PC, WinCC 7.2; - low voltage complete device – SIEMENS, PHOENIX CONTACT; - data transmission networks – Profibus DP, Industrial Ethernet.
- Project status:
- Completed
- About the project:
- Modernization of elevator PLC equipment
Development of design and software documentation for modernization of elevator PLC equipment. Modernization of elevator PLC equipment
Amount of work:
- Paternoster, separator, valve, reversing valve, distributor, conveyor, auger conveyor, sweep auger, ventilation unit, rotary valve, filter, compressor control;
- Silo charging/discharging control;
- Route control.
Scope of work:
- Development of design documentation:
- automation – designing automated technical processes – stage “Working project”; - Software development;
- Onsite assembling;
- Commissioning of the automation and control system;
- Operating and technical personnel training;
- Experimental-industrial commissioning (72 hours);
- Commissioning.