Modernization of Trim emission. ACS of air recirculation on the utilization section.

Link:
http://www.pg.com.ua/
Year:
2013
Technologies:
1794-ACN15 Allen Bradley, frequency inverter ACS550 ABB
Project status:
Completed
About the project:
Modernization of Trim emission, ACS of air recirculation on the utilization section.

Main tasks of upgrading ACS of TP:

  • to develop, install and debug the system of controlled (according to the temperature in the shop)  air recirculation from technological filter Trim, to accept a system from equipment installation contractor, to send the system to Customer for usage.
  • to teach Customer’s employees, to send executive documentation and Work completion certificates within specified period as soon as possible.

 Selected solutions for ACS:

  • PLC - 1794-ACN15, «ALLEN BRADLEY»
  • frequency inverters ACS550, «АВВ»
  • applied networks – ControlNet
  • temperature sensors - ТСМУ2-10Г-100М, PJSC «ТЕRA»
  • pressure sensors - 1141-0110-200, «PREMSGARD»
  • emergency main switch station - IU=25A, «SIEMENS»

Scope of works:

  • Development of the project documentation for automation.
  • installation and development of automation systems.
  • debugging of control systems.
  • installation and debugging of the systems based on the network ControlNet.
  • electrical installation works.
  • programming process control systems.