Modernization of Trim emission. ACS of air recirculation on the utilization section.
- Link:
- http://www.pg.com.ua/
- Year:
- 2013
- Technologies:
- 1794-ACN15 Allen Bradley, frequency inverter ACS550 ABB
- Project status:
- Completed
- About the project:
- Modernization of Trim emission, ACS of air recirculation on the utilization section.
Main tasks of upgrading ACS of TP:
- to develop, install and debug the system of controlled (according to the temperature in the shop) air recirculation from technological filter Trim, to accept a system from equipment installation contractor, to send the system to Customer for usage.
- to teach Customer’s employees, to send executive documentation and Work completion certificates within specified period as soon as possible.
Selected solutions for ACS:
- PLC - 1794-ACN15, «ALLEN BRADLEY»
- frequency inverters ACS550, «АВВ»
- applied networks – ControlNet
- temperature sensors - ТСМУ2-10Г-100М, PJSC «ТЕRA»
- pressure sensors - 1141-0110-200, «PREMSGARD»
- emergency main switch station - IU=25A, «SIEMENS»
Scope of works:
- Development of the project documentation for automation.
- installation and development of automation systems.
- debugging of control systems.
- installation and debugging of the systems based on the network ControlNet.
- electrical installation works.
- programming process control systems.