JSC "Semiconductor Plant” Zaporizhzhya

Link:
Year:
2011
Technologies:
S7-417H/ PCS7 v.7.0
Project status:
Completed
About the project:
ACS TP, despatching, MCC energy distribution for polycrystalline silicon production. Project, delivery, adjustment