-
By region 200
-
By industry 201
“DANONE DNIPRO”, Kherson
- Link:
- Year:
- 2011
- Technologies:
- S7-300/ WinCC 6.2/ Profibus
- Project status:
- Completed
- About the project:
- Modernization of control panel SPS (sewage pumping stations) and SWPS (storm water pumping station) of control system with integration of data into an existing visualisation system. Design, supply, installation and commissioning.